Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Abduh, M and Skibniewski, M J (2004) Electronic networking technologies in construction. Journal of Construction Research, 5(01), 17–42.

Dainty, A R J, Bagilhole, B M, Ansari, K H and Jackson, J (2004) Creating equality in the construction industry: an agenda for change for women and ethnic minorities. Journal of Construction Research, 5(01), 75–86.

Gidado, K (2004) Enhancing the prime contractor's pre-construction planning. Journal of Construction Research, 5(01), 87–106.

  • Type: Journal Article
  • Keywords: Construction planning; project complexity
  • ISBN/ISSN: 1609-9451
  • URL: http://www.worldscinet.com/jcr/05/0501/S1609945104000073.html
  • Abstract:
    Technological advancements and continuous fragmentation of the construction industry have resulted in a spiral increase in complexity of building projects. The changes the construction industry has experienced in recent years have influenced production rates, techniques and procedures. Also types of materials, plant and other resources used have being changing. The effect of these continuous changes is exacerbated by the continuous demand for speed, zero defects, higher safety, welfare and environmental standards. Unfortunately, this spiral increase in complexity is not being matched with an equal increase in planning effort, especially at the pre-construction stage. Contractors have failed to adjust their planning to a more detailed level such as the "role" level. [note: Role is a function performed by a person using other resources e.g. lay a brick. Technology is a collection of the same or various roles e.g. bricklaying. ] The industry still plan projects at the activity level. [note: Activity is a combination of various technologies e.g. building a wall. ] The failure to plan projects at role level is widening the gap between contractors, subcontractors and the operatives. This is obvious by the lack of use of scientific management tools (such as work-study) on today's construction sites. All these problems make pre-construction planning to be an increasingly important ingredient for successful delivery of projects. Good pre-construction planning can only have a fruitful effect if the production process is well understood and is carefully planned at the right level, at the right time, and using the right procedure, expertise and experience. This paper therefore, proposes a simple systemic approach or model that can be used in practice to improve and standardise the process of the prime contractor's planning of construction projects at the pre-construction stage. The uniqueness of the proposed approach is stems from planning at the role level and focusing on the effect of project complexity on project time and cost. The work described in the paper is based upon structured interviews with selected practitioners and case studies on current practice in the South East of England. The work concluded that the implementation of the proposed system of pre-construction planning will contribute to capturing knowledge and experience and to producing consistency and reliability in practice, and thus produce innovation and value in project systems implementation with more reliable predictions of construction project time and cost.

Koch, C (2004) Can knowledge management become global? - consulting engineering companies in the knowledge economy. Journal of Construction Research, 5(01), 107–24.

Koksal, A and Arditi, D (2004) An input/output model for business failures in the construction industry. Journal of Construction Research, 5(01), 1–16.

Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(01), 125–38.

Webb, R M, Smallwood, J and Haupt, T C (2004) The potential of 4d cad as a tool for construction management. Journal of Construction Research, 5(01), 43–60.

Williamson, M, Wilson, O, Skitmore, M and Runeson, G (2004) Client abuses of the competitive tendering system: some general principles and a case study. Journal of Construction Research, 5(01), 61–73.

Wu, D, Chan, E H W and Shen, L (2004) Scoring system for measuring contractor's environmental performance. Journal of Construction Research, 5(01), 139–47.